Advantages of centrifugal concrete pole mold :
1.Cylinder body: The material blanking according to the customer's order model ,
The Maximum single length is 12m , And the cylinder body has less welding seams ,which reduces the influence of welding
deformation and the error of manual docking 2.Running wheel: The material is adopted 30Mn cold roll forming, with good wear
resistance. 3.Welding: It is advisable to adopt the section welding process, the welding method is carbon dioxide shielded
welding, the gas is mixed gas, and the welding machine adopts Panasonic welding machine, the welding spot is beautiful, and there
is no welding slag. 4.Lathe: Introduce CW61180L-16m ultra-long lathe, ∅1000mm×15.4M and below specifications are open for overall
processing, and the concentricity of the steel mold is better. 5.Anti-leakage grout: Our company uses a planer for a groove at the
joint between the upper mold and the body, and an elastic sealing rubber strip is inserted into the groove. This rubber strip can
be reused or replaced at any time. Put an end to the problem of ground joint leakage.
Centrifuge composition diagram
Advantage of Spinning Machine:
1.Through shaft: Material is 40Cr, medium frequency conditioning to HB220-280, high tensile strength, yield strength and
hardenability, good toughness. 2.Supporting wheel: material is 40Cr forgings, medium frequency conditioning to HRC35-40, strong
impact resistance, good wear resistance;The wheel can be integral retaining edge and movable retaining edge. 3.Tightening sleeve:
material is 45# forgings, conditioning to HB220-280, yield strength ≥355Mpa 4.Bearings: Wafangdian bearings - comprehensive
economic and technical indicators in the bearing industry in China ranked first, the world ranked 12th. 5.Bearing seat: Material
is ZG35. 6.Base:Material is ZG35 or H STEEL ( Q235B). 7. Electrical system: Due to the deformation of individual centrifugal
molds(pole/pipe/pile mold) or irregular mold clamping, mold jumping or mold flying may occur during high-speed centrifugation,
which is a major safety production hazard. In response to this situation, our company has developed an anti-jumping mode frequency
conversion cabinet. The system has two functions: automatic frequency reduction and manual frequency reduction. The automatic
frequency reduction can be automatically realized three times, and the corresponding centrifugal time can be increased for each
frequency reduction. The basic frequency can be set according to different types of molds, and the current percentage can be
monitored. In the phase of raising the speed, the acceleration time is superimposed to ensure that the raising speed is more
balanced. At the same time, users can also select the energy feedback unit. The energy feedback unit automatically detects the DC
bus voltage of the frequency converter, reverses the DC voltage of the DC link of the frequency converter into the AC voltage with
the same frequency and phase as the grid voltage, and is connected to the AC grid after multiple noise filtering links, so as to
achieve the purpose of energy feedback to the grid, The electric energy fed back to the power grid reaches more than 95% of the
power generation energy, effectively saving electric energy.
Concrete pole production line supporting machine
Q:Do you have set up an independent factory?
A:We have our own factory. Has the specialized cement machinery product equipment factory, also has the large-scale cement drain pipe production factory.
Q:What can you do for us?
A:1. Before sales can be targeted to give some constructive Suggestions.
2.Make a specific plan for your needs.
3. After sales reference specific products, different products have different services. Refer to the specific product description.
Q: Can you do the basic design for us?
A: Yes, we have a professional team with rich experience in basic design of cement pipe making equipment with CAD software. You just need to tell us your ideas and requirements, and we will provide you with the most perfect design.
Q:Can your engineers train our workers in our factories?
A:Yes, we have a very large engineering installation team that can train and instruct your workers to operate the installation equipment.
Q:If we provide the parameter requirements, can we make it to order?
A:We provide customized services as long as you provide the appropriate drawings and product requirements.
Q:How long is your lead time?
A:Our delivery time varies according to the quantity of the order, usually around 30 days.